Mexico’s COFEPRIS has published guidance on nitrosamine impurities but it is merely for reference purposes only. Companies selling medicines in Mexico should consider the potential sites where nitrosamines might be created or introduced into their products and record their findings.

This article details COFEPRIS’ guidance and discusses the essential elements of risk assessment, testing, risk reduction and reporting.

Overview of COFEPRIS Nitrosamine Guidance

COFEPRIS has published a document specific for nitrosamines, and the guide is the centre of COFEPRIS nitrosamine regulations in Mexico today. It’s called Guía para la valoración, manejo y mitigación de riesgos por la presencia de impurezas de nitrosaminas en fármacos y medicamentos en México.

Background and Publication History

For years, COFEPRIS handled nitrosamines one product at a time. Valsartan drew alerts and marketing restrictions in 2018. Ranitidine followed in 2019, with the same treatment. Each case was dealt with on its own terms, and no shared method tied them together.

That changed in 2024. Now one guide replaces the case by case approach. It can be used on any products containing Appendix 1 ingredients, regardless of the molecule, by registration holders and manufacturers. It is backed up by two appendixes:

  • Appendix 1 lists 297 priority drug substances.
  • Appendix 2 (December 2024) lists acceptable intake (AI) limits for 125 nitrosamines.

COFEPRIS states that it will keep updating the guide as new evidence emerges.

Scope of the Guidance

This guide is for registration holders (TRS), drug-substance manufacturers and importers (FIF) and supply-chain establishments, for products containing any Appendix 1 ingredient. COFEPRIS may extend it to other products by notice. The TRS and FIF have a responsibility for the prevention and control of nitrosamines. Only laboratories are listed as testing providers.

Regulatory Status in Mexico

The COFEPRIS guide is not a law. According to its own notice it is only a guide (meramente orientativo). The binding rules are based on the legislation in Mexico and standards such as the “NOM-059-SSA1-2015”. FDA and EMA documents are only scientific references.

Even so, the guide shows what COFEPRIS expects. It asks companies to prevent and minimize nitrosamine impurities, so companies should treat it as a working standard. The Mexico nitrosamine guidelines are in addition to COFEPRIS pharmaceutical regulations regarding quality.

Nitrosamine Impurities in Pharmaceuticals

Nitrosamines are impurities that can form in medicines or enter them during manufacture. They each pose different risks and so require individual assessment.

Types of Nitrosamines, Including NDSRIs

FDA groups nitrosamines into two types:

  • Smalls molecule nitrosamines are not the same as the active ingredient and can be found in various products.
  • Nitrosamine drug substance-related impurities (NDSRIs) are impurities derived from the active ingredient and are typically unique to a specific active ingredient.

There are different acceptable intake limits for every nitrosamine. They cannot be substituted for each other.

Potential Sources of Nitrosamine Impurities

Nitrosamines can form when certain amines meet nitrites, so the risk review should look for where those two could meet. The COFEPRIS guide points to:

  • Raw materials, solvents and recycled solvents that contain amines
  • Nitrites in excipients or process water
  • Shared manufacturing equipment
  • Packaging such as nitrocellulose blister foil

EMA and FDA add that packaging and equipment can leach nitrites or nitrosamines into a product. These are places to check, not proof that a product is affected.

Patient Safety Considerations

Not every detection carries the same risk. ICH M7(R2) relates safe limits to how the medicine is used. The main factors are:

  • Which nitrosamine it is
  • How much is present
  • The daily dose
  • How long the patient takes the medicine
  • The route of administration

A detection is a reason to assess the risk. It is not an automatic failure.

COFEPRIS Nitrosamine Risk Assessment and Testing Requirements

Determine if a nitrosamine risk exists, test only when the risk is present, and document the finding. The COFEPRIS guide outlines this in three phases: risk assessment, confirmatory testing and management actions.

Stage 1: Risk Assessment and Identification of Potential Sources

A nitrosamine risk assessment should evaluate the product throughout its entire lifecycle, including:

  • Active ingredient synthesis, starting materials and reagents
  • Raw materials and suppliers
  • Recycled solvents and materials
  • Formulation and manufacturing conditions
  • Storage and packaging

The guide sets these Mexican points:

  • Qualified staff prepare the assessment, and the registration holder (TRS) or drug-substance manufacturer or importer (FIF) approves it.
  • The assessment covers every presentation of the product and includes an exposure calculation where nitrosamines are possible.
  • For imported products, the holder gets the origin-country assessment in the original language and in Spanish.

If the assessment finds no risk and the evidence supports that, COFEPRIS says confirmatory testing is not needed. It recommends finishing this stage within eight months of publication.

Stage 2: Confirmatory Testing and Analytical Evaluation

If a risk remains, test for it. Nitrosamine impurity testing has to suit the impurity and the product, so there is no single method for every case. The guide asks for:

  • Validated methods that are specific and selective
  • A limit of quantification at or below the lowest acceptable intake limit that applies
  • Sample preparation included in the validation
  • On how many batches to test, the guide gives this example:
  • If the cause is known and batches are consistent, test the greater of 10% of annual batches or three batches a year.
  • If fewer than three batches are made a year, or the cause is unknown, test all batches.

Confirmatory tests go to laboratories that COFEPRIS has authorized as third parties. A negative result does not remove every risk.

Acceptable Intake Limits and Exposure Assessment

An acceptable intake limit is the daily amount of an impurity that carries negligible cancer risk. The practical question is: how much of this impurity can the maximum daily dose contain?

COFEPRIS has adopted the limits set by international agencies, and will set its own if agencies disagree. Acceptable intake limits differ by substance. For example, Appendix 2 lists NDMA at 96 ng/day and NDEA at 26.5 ng/day. Never copy a limit from one nitrosamine to another.

Three more rules from the guide are:

  • ICH M7’s general 1.5 µg/day threshold does not apply to nitrosamines.
  • When several nitrosamines are present, total daily intake must stay within the lowest limit that applies.
  • For an unlisted nitrosamine, the guide suggests 18 ng/day as a default.

FDA and EMA publish their own lists, and those lists change. Check the current version before you draw a conclusion.

Documentation of Risk Assessment and Testing Conclusions

It’s good practice to document the method, the risks identified and rejected, the testing plan, the outcomes of the testing, the exposure calculations and follow up. Manufacturers should complete a Reporte de Resultados (RR) which contains the following:

  • The risk assessment, signed off on company letterhead
  • The test results
  • A list of batches on the market
  • A mitigation plan, if limits are exceeded

When nitrosamines are not detected, there is no requirement to submit the results to COFEPRIS, but you must keep them available.

Nitrosamine Risk Management and Mitigation

When a nitrosamine risk is possible or confirmed, find the cause and reduce the exposure.

Root-Cause Investigation and Corrective Actions

Start by finding out how the impurity formed or got in. Look at active ingredient synthesis, raw materials, suppliers, manufacturing steps and formulation. Then check which batches and products are affected.

Mexico’s NOM-059-SSA1-2015 says manufacturers must investigate deviations and defects, find out why they happened, and fix them with corrective and preventive actions (CAPA). The standard doesn’t mention nitrosamines. Still, these steps help manufacturers investigate and manage potential impurity risks.

Manufacturing and Raw-Material Controls

Choose controls that fit the cause. The guide gives these examples:

  • Avoid certain chemicals and recycled materials
  • Control pH and temperature more tightly
  • Change the order in which materials are added
  • Use dedicated equipment
  • Check raw-material quality and suppliers
  • Formulation, Packaging, and Process Changes

The formulation, the process, the packaging or the storage conditions may need to change, and shelf life may need to be shortened. Check the effect of any change on quality, stability and the registered product first. After validation, the registration holder tells COFEPRIS, using the existing procedure Modificación a las condiciones del registro sanitario de medicamentos con cambio en los procesos de fabricación.

CAPA and Ongoing Monitoring

After fixing the problem keep monitoring through your quality system:

  • Record every change through change control, and update the risk assessment after any change.
  • Review stability trends and investigate unexpected results.
  • Check that your CAPA actions worked.
  • Carry out a residual risk evaluation after your actions, as the guide asks.

COFEPRIS Notification and Reporting Obligations

The COFEPRIS guide has its own reporting route, built around a report called the Reporte de Resultados (RR). Its wording ranges from “may notify” to “submit immediately”, so treat it as COFEPRIS’s expectation. General Mexican rules on quality, recalls and pharmacovigilance apply alongside it.

When May Regulatory Notification Be Necessary?

The COFEPRIS guide outlines notification expectations based on nitrosamine test results:

  • Nitrosamines found within the acceptable intake (AI) limit: the guide calls notifying COFEPRIS important and recommends improving your controls.
  • Nitrosamines found above the AI limit: decide your corrective actions and submit an RR immediately.
  • No nitrosamines found: you do not need to send the results to COFEPRIS

Not every detection means a recall. For products above the AI limit, the guide recommends stopping sales and withdrawing the product. The exceptions are cases where no alternative treatment exists, or where a shortage would cause more harm.

There are two other requirements to keep in mind. If a product needs to be recalled, the registration holder must inform COFEPRIS under NOM-059-SSA1-2015. Adverse reactions are handled separately under NOM-220-SSA1-2016, which covers pharmacovigilance.

Information and Supporting Evidence

The RR should include:

  • The risk assessment
  • The confirmatory test results
  • An updated list of batches on the market, with how they were distributed
  • A plan to keep levels below the AI limit for the product’s whole shelf life
  • It also helps to keep your root-cause findings and corrective actions on file.
  • Communication with COFEPRIS and Product-Quality Actions

Write down how you decide what kind of problem you have: a routine quality investigation, a notification, a recall, or a registration change.

For the RR, the guide describes a letter addressed to the COFEPRIS Comisión de Evidencia y Manejo de Riesgos, handed in at the COFEPRIS service centre in Mexico City. Confirm the delivery address with COFEPRIS before submitting. For questions about the guide, it gives nitrosaminas.mexico@cofepris.gob.mx. The guide names no online portal for nitrosamine reports.

Reporting Timelines

The RR may be submitted within 15 business days after you receive your confirmatory test results. COFEPRIS may reply with recommendations within 60 business days.

Regulatory Timelines and Current Compliance Status

The following timelines are specified in Version 1.0 of the COFEPRIS guide, published on 31 July 2024

  • Stage 1 (risk assessment): finish within eight months, which its page gives as August 2024 to March 2025.
  • Stages 2 and 3 (testing and management actions): finish within 36 months of publication, which runs to July 2027.

Current Compliance Expectations

Four areas need to be considered:

  • Mexican regulations: NOM-059-SSA1-2015 covers quality requirements, including the investigation of deviations and product recalls.
  • COFEPRIS guidance: Explains the three assessment stages, two appendixes, reporting process and recommended timelines.
  • International guidance: FDA, EMA and ICH documents provide scientific references.
  • Good practice: Assessments should be documented and reviewed regularly.

Impact on Pharmaceutical Manufacturers and Marketing Authorization Holders

In Mexico, nitrosamine control is now part of routine pharmaceutical compliance. Supplier information, product changes and risk assessments all need to be managed carefully.

Registered Medicines and Product Lifecycle Management

A nitrosamine risk assessment can affect a medicine at several points in its life, including:

  • Existing registered products and new applications
  • Changes of API or supplier
  • Changes to the manufacturing process or formulation
  • Stability programs and product specifications

How much each change affects your registration depends on Mexican requirements and the product.

Supplier Oversight and Supply-Chain Coordination

Nitrosamine risk can start anywhere in the supply chain, so everyone involved needs to share information. That includes API makers, finished-product manufacturers, excipient and packaging suppliers, contract manufacturers, laboratories and the marketing authorization holder. For example, a change in how the API is made can change the risk in the finished product.

Integration Into the Pharmaceutical Quality System

You do not need a separate system for nitrosamines. Build them into the quality tools you already use: quality risk management, supplier management, deviations, change control, CAPA and stability programs.

Practical Compliance Challenges

  • Suppliers who do not share enough information
  • Unclear causes of nitrosamine formation
  • Test methods that are not sensitive enough
  • Uncertainty about the right acceptable intake value
  • Different assessments at different sites
  • Slow action on mitigation
  • Confusion between Mexican and foreign requirements

A nitrosamine assessment is only as useful as the process and supplier information behind it. When the API manufacturer, formulation team and finished-product authorization holder work from different assumptions, the resulting risk assessment can leave important gaps.

Conclusion

Compliance rests on a science-based assessment of impurity sources, suitable testing, impurity-specific exposure assessment, documented mitigation and timely action. Under COFEPRIS nitrosamine regulations in Mexico, confirm the current Mexican position instead of assuming FDA or EMA guidance applies. Watch for new COFEPRIS instructions, and keep manufacturing, analytical, quality and regulatory teams aligned.